期刊文献+

天津地铁2、3号线计轴故障处理及实例分析 被引量:1

Procedure with Axle Counter Failure and A Case Study of Tianjin Metro Line 2 and Line 3
下载PDF
导出
摘要 天津地铁2、3号线采用基于无线通信的列车控制系统,并利用计轴设备作为冗余支持。试运营以来,列控系统运行总体稳定,但计轴设备故障较为常见,对正常运营秩序有一定影响。根据计轴设备构成和工作原理,分析计轴故障对行车工作造成的影响。从行车人员的角度,阐述了计轴故障的基本处置方式。并以空港站为例,具体分析了计轴故障处置过程中的关键环节和注意事项。 Tianjin metro Line 2 and Line 3 have adopted radio communication based train control (CBTC) system which uses the axle counter equipment as redundancy support. Since the trial operation, the whole CBTC system has been very stable, but the failures occurred in axle counter system are quite often and directly influence the normal metro operation. According to the structure of axle counter system and its operating principle, the influences on train running are analyzed. From the angle of train operators, the procedure with axle counter failures is stated, according to a case study of Tianjin Airport Economic Area Station, the key points and links in failure procedure are analyzed in detail.
作者 付强 王丹
出处 《城市轨道交通研究》 北大核心 2016年第5期129-132,共4页 Urban Mass Transit
关键词 天津地铁 计轴设备 故障 处理流程 Tianjin metro axle counter equipment failure process flow
  • 相关文献

参考文献5

二级参考文献13

共引文献20

同被引文献13

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部