Study on Defects Processing Technology of Ledge Beam Rock Bench for TBM Assemble Hole
下载PDF
导出
摘要 TBM组装间岩壁梁在施工过程中,由于受地质条件及人为因素影响,导致TBM组装间岩壁梁在施工过程中发生无法成型或岩壁梁岩台存在缺陷,对后序岩壁梁上部吊车轨道安装埋下严重的安全隐患。以吉林引松供水总干线三标TBM组装间岩壁梁为研究背景,对岩壁梁缺陷处理进行了详细分析和研究,提出了岩壁梁岩台缺陷的处理技术,并对研究结果进行了验证,对类似工程有一定的参考价值。 During the construction process of TBM assemble hole ledge beam, because of the geological conditions and artificial influence factors, the ledge beam could not be formed or there would be some defects in rock bench of ledge beam, which were serious security risks to the next installation of crane track in upper part of ledge beam. With the research background of TBM assemble hole ledge beam of the 3rd contract section in main channel of transferring water from Songhuajiang River, the detailed analysis and study were carried out to put forward processing technology of ledge beam defects. The verified research results have some reference values to the similar project.
作者 苗双平
出处 《探矿工程(岩土钻掘工程)》 2016年第5期89-91,共3页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 隧道施工 TBM组装间 岩壁梁 缺陷 处理技术 tunnel construction TBM assemble hole ledge beam defect processing technology
  • 相关文献

参考文献16

二级参考文献77

共引文献33

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部