摘要
根据2014底对黄壁庄水库库区120,125m界桩的实地勘查及界桩运行情况,针对工程确权划界效益,现存情况提出了解决方案及建议。
According to the report of Huangbizhuang Reservoir's 120,125m boundary post on-site inspection and running situation in the end of 2014. Reviewed the existing situation of projects indeed the right and demarcation and its'benefits. Put forwarding constructive comnents against the existing cases.
出处
《水科学与工程技术》
2016年第2期20-22,共3页
Water Sciences and Engineering Technology
关键词
确权划界
水源保护
工程效益
工程测量
安全运行
equaling demarcation
water conservation
projects benefit
engineering surveying
safe operation