PBA工法、洞桩法的对比分析和改进措施 被引量:6

Comparison of PBA and Cavern-pile Method and Improvement Measure
下载PDF
导出
摘要 根据沈阳地铁二号线崇山路站的设计及现场施工情况,将PBA工法与洞桩法混合施工的双柱三跨式暗挖地铁车站施工技术方案进行了简单介绍,并对PBA法、洞桩法及两者混合工法的技术方案进行了较为详细的对比和分析,并根据该工程的实际施工经验,提出了崭新的改进性意见。 In terms of the design and construction of the Chongshan Road Station of Shenyang Metro Line 2,the combination of PBA and cavern-pile method which was applied to the underground excavation of the two-column-three-span metro station was introduced.The analysis and comparison of PBA and cavern-pile method and the combination method were conducted,and suggestions on improvement were proposed based on experience from the project.
作者 朱统步
出处 《筑路机械与施工机械化》 北大核心 2016年第5期88-91,共4页 Road Machinery & Construction Mechanization
关键词 PBA工法 洞桩法 混合工法 小导洞 PBA method cavern-pile method combination method small pilot hole
  • 相关文献

参考文献3

二级参考文献7

  • 1Walter J Hinkel,etc. Underground Railways ‘yesterday today tomorrow' from 1863 upto the year 2000. compress verlag.
  • 2鐵道綜合技術研究所.シ-ルドトンネルの實例集[M].,1994,10..
  • 3于书翰 杜谟远.隧道施工[M].北京:人民交通出版社,1992..
  • 4(日)地盘工学会.設計から施工まで[M].,1997..
  • 5(日)地盘工学会.シ-ルド工法の调查[M].,1997..
  • 6(日)鉄道総合技術研究所.鉄道構造物等設計標準同解說[M](シ-ルドトンネル)[M].,平成9,7..
  • 7(日)地盘工学会.シ-ルドトンネルの新技术[M].,1995..

共引文献92

同被引文献61

引证文献6

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部