摘要
本文收集了长山采区的地质情况、卤井状况和生产情况,重点分析了120片区存在的问题,提出采用修井、新建水平井相结合的方式,对该片区进行挖潜的构想。
This paper collects the geological conditions, brine well status and production status of Changshan Mining Areas. The existing problems in 120 District have been mainly analyzed. This paper raises the method which combines well repairing and new constructional horizontal well, and conceives the digging potential in this district.
出处
《中国井矿盐》
CAS
2016年第3期18-19,29,共3页
China Well and Rock Salt
关键词
闲置片区
挖潜
增产
Idle district, digging potential, increase production