期刊文献+

柔性系绳平衡状态临界绳长研究

Study on Flexible Tether Critical Length at Equilibrium State
下载PDF
导出
摘要 为了确定柔性系绳系统在平衡状态下的临界绳长,在考虑大气阻力、系绳伸展性、系绳质量等因素的情况下,基于系绳系统轨道运动建立了系绳平衡状态方程.为确定求解系绳平衡方程所需初值条件,分析了载荷受力情况并建立其平衡状态方程,进而分析给出了系绳长度达到临界值的条件以及临界绳长的计算方法.仿真计算了不同载荷质量、系绳直径和载荷弹道系数这三种情况下系绳的临界绳长,分别拟合得到这三种情况下临界绳长的计算方程,并分析了不同载荷质量、系绳直径和载荷弹道系数对系绳临界绳长的影响. In order to determine flexible tether critical length at equilibrium, based on orbital mo- tion of tether system, the tether equilibrium equations are established considering the atmospheric drag, tether extensibility and tether mass. Then, the load stress distribution is analyzed, and load equilibrium equations are established for determining the needed initial condition of tether equilibri- um equations. Furthermore, the condition that tether length reaches critical value and the computing method of tether critical length are both given. Finally, different tether critical lengths are respec- tively calculated under three conditions including different load masses, tether diameters and load ballistic coefficients. Three different critical length equations are given by fitting. The impacts on critical length are analyzed under these three different conditions.
出处 《空间科学学报》 CAS CSCD 北大核心 2016年第3期373-379,共7页 Chinese Journal of Space Science
基金 国家国际科技合作项目 西北工业大学本科毕业设计论文重点扶持项目共同资助
关键词 柔性系绳 载荷 平衡状态 临界绳长 Flexible tether, Load, Equilibrium state, Critical length
  • 相关文献

参考文献5

二级参考文献29

  • 1金文彬,刘永祥,黎湘,任双桥.再入目标质阻比估计算法研究[J].国防科技大学学报,2004,26(5):46-51. 被引量:17
  • 2Mankala K K,Agrawal SK.Dynamic modeling and simulation of tethered satellite systems[J].Journal of Vibration and Acoustics,2005,127(2):144-156.
  • 3Abdel Rahman E M,Nayfe h A H,Masoud Z N.Dynamics and control of cranes:A review[J].Journal of Vibration and Control,2003,9(7):863-908.
  • 4Omar H M,Nayfeh A H.Gantry cranes gain scheduling feedback control with friction compensation[J].Journal of Sound and Vibration,2005,281(2):1-20.
  • 5Todd M D,Vohra S T,Leben F.Dynamical measure-merits of ship crane load pendulation[C] //Oceans 97 MTS/IEEE:Conference Proceedings,Halifax,Canada,1997,2:1230-1236.
  • 6Moustafa K A F,Ebeid A M.Nonlinear modeling and control of overhead crane load sway[J].Journal of Dynamic Systems Measurement and Control,1988,110(3):266-271.
  • 7Benhidjeb A,Gissinger G L.Fuzzy control of an overhead crane performance comparison with classic control[J].Control Engineering Practice,1995,3(12):1687-1696.
  • 8Cheng Yuan C,Kuo Hung C.Intelligent fuzzy accelerated method for the nonlinear 3-D crane control[J].Expert Systems with Applications,2009,36:5750-5752.
  • 9Uchiyama N.Robust control of rotary crane by partial-state feedback with integrator[J].Mechatronics,2009,19:1294-1302.
  • 10Brown R H,Schneider S C,Mulligan M G.Analysis of algorithms for velocity estimation from discrete position versus time data[J].IEEE Transactions on Industrial Electronics,1992,39(1):11-19.

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部