摘要
本文结合新建张家口至呼和浩特铁路站前工程ZHZQ-4标段跨京藏高速立交特大桥的具体实践,就铁路特大桥连续梁挂篮悬浇节段施工关键工序的技术控制进行了简要介绍。
In this paper, the Zhangjiakou to Hohhot Railway Station Project ZHZQ-4 section across the Beijing Tibet Expressway Overpass Bridge, continuous beam railway major bridge hanging basket County casting section some key construction process control technology were briefly introduced.
出处
《建筑技术开发》
2016年第5期76-77,共2页
Building Technology Development
关键词
特大桥
连续梁
挂篮悬浇
extra large bridge
continuous beam
hanging basket