期刊文献+

PPP模式决策的影响因素分析——基于发展中国家的经验 被引量:19

Determinants of Public-Private Partnerships in Infrastructure:Based on an Empirical Analysis of the Developing Countries
下载PDF
导出
摘要 基础设施融资采用公私合营模式日益受到中国政府的重视。从发展中国家公私合营模式的经验入手,分析公私合营模式的类型、行业和地区分布特征;利用世界银行数据库,使用计数模型的零膨胀负二项估计方法,实证分析31个主要的发展中国家基础设施建设采用公私合营模式的影响因素,实证结果表明:市场需求和政府财政约束因素占主导作用,其次是政策环境因素、组织结构质量和法制化水平因素,影响较小的因素是宏观稳定性变量。 Firstly, this paper analyses the type of the PPP mode, industry distribution and regional distribution on the base of the developing countries. Secondly, using the World Bank PPI database, this article makes use of negative binomial estimation method to analyze on 31 maior developing countries data from 1996 to 2011. The empirical results show that the market demand and fiscal constraints factors plays the leading role, comparing to the policy environment, organization structure, quality and legalization level factors which play the secondary role, and macroeconomic stability has the least influence.
作者 陈世金 刘浩
出处 《统计与信息论坛》 CSSCI 北大核心 2016年第5期70-76,共7页 Journal of Statistics and Information
基金 河北省社科联社会科学发展研究课题<河北省新型城镇化资金保障机制研究>(2015040203)
关键词 公私合营 基础设施融资 零膨胀负二项估计 public-private partnerships infrastructure finance negative binomial estimation
  • 相关文献

参考文献10

二级参考文献88

  • 1贾康,孙洁.社会主义新农村基础设施建设中应积极探索新管理模式-PPP[J].经济学动态,2006(10):54-58. 被引量:16
  • 2贾康,孙洁.农村公共产品与服务提供机制的研究[J].管理世界,2006,22(12):60-66. 被引量:124
  • 3孟宪海.关键绩效指标KPI——国际最新的工程项目绩效评价体系[J].建筑经济,2007(2):50-52. 被引量:37
  • 4王守清,柯永建.特许经营项目融资[M].清华大学出版社,2008年7月:98-99.
  • 5Liou F M, Huang C P. Automated approach to negotiations of BOT contracts with the consideration of project risk[J]. Journal of Construction Engineering and Management, 2008, 134(1): 18-24.
  • 6Asian Development Bank. Technical assistance People's Republic of China: Application of public-private partnerships in urban rail-based transportation project[R]. Project Number: 39527, December 2005.
  • 7Jin X H, Doloi H. Interpreting risk allocation mechanism in public-private partnership projects.. An empirical study in a transaction cost economies perspective [J]. Construction Management andEconomics. 2008.26(7). 707-721.
  • 8Roumboutsos A, Anagnostopoulos K P. Public-private partnership projects in Greece: Risk ranking and preferred risk allocation [J]. Construction Management and Economics, 2008, 26(7): 751 -763.
  • 9EAP^3N. Public-Private Partnership in Infrastructure Development: Case Studies from Asia and Europe [M]. Weimar, Germany: EU-Asia Network o( Competence Enhancement on Public-Private Partnerships in Infrastructure Development, August 2007.
  • 10Wang S Q, Tiong R L K. Case study of government initiatives for PRC's BOT power plant project [J]. International Journal of Project Management, 2000, 18 (1) : 69 - 78.

共引文献595

同被引文献248

引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部