摘要
本文探讨了评价压水堆全压双层安全壳直接旁路泄漏的设计思路,特别是如何识别潜在旁路泄漏途径和如何确定旁路泄漏率,提出环廊初始维持较大负压使事故后不出现"正压"阶段从而不需评价"正压"期间旁路泄漏,和环廊初始维持较小负压且需评价事故后"正压"阶段持续时间两种主要设计思路,可指导研发先进压水堆核电厂时选择系统设计方案。
Two design approaches of dual containment direct bypass leakage evaluation (especially the identification of potential bypass leakage paths and the determination of bypass leakage rate) are proposed, maintaining a big initial annulus negative pressure and eliminating the positive pressure period after accidents which allows no direct bypass leakage during the positive pressure period, or maintaining a small initial annulus negative pressure and evaluating the positive pressure period after accidents, which can guide the advanced nuclear power plant research and development.
出处
《核科学与工程》
CAS
CSCD
北大核心
2016年第1期56-61,共6页
Nuclear Science and Engineering
关键词
双层安全壳
直接旁路泄漏
环廊通风系统
dual containment
direct bypass leakage
Annulus ventilation system