摘要
基于层次分析(AHP)法,对沙特阿拉伯某铜锌矿地下巷道的掘进爆破因素进行分析,确定了影响该铜锌矿掘进爆破效果因素的影响权重,依据影响权重进行了爆破施工跟踪调查,发现并解决了实际施工存在的问题,达到了掘进爆破施工优化的目的。
This paper uses Analytic Hierarchy Process(AHP)to carry out blasting factors for underground tunneling in a Copper-Zinc Mine in Saudi Arabia.The factors affecting tunneling blasting and their influence weight are determined.And the factors are tracked in the progress of site construction according to the factors' influence weight.The existed problems in actual construction are found and solved to achieve the purpose of tunneling blasting construction optimization.
出处
《有色金属(矿山部分)》
2016年第3期66-69,共4页
NONFERROUS METALS(Mining Section)
关键词
层次分析法
掘进爆破
因素分析
施工优化
AHP
tunneling blasting
factors analysis
construction optimization