6Kuba T, van Loosdrecht M C M, Heijnen J J. Phosphorus and nitrogen removal with minimal COD requirement by integration of nitrification in a two-sludge system [J]. War Res, 1996, 42(1-2) : 1702-1710
7Kuba T, van Loosdrecht M C M, Brandse F A, et al. Occurrence of denitrifying phosphorus removal bacteria in modified UCT-type waste water treatment Plants [J]. War Res, 1997, 31(41 ) : 777-786.
8Bortone G, Marsili L S, Tilehe A, et al. Anoxic phosphate uptake in the dephanox process [J]. War Sei Tech, 1999, 40(4-5): 177- 183.
9Copp J B, Dold P. Comparing sludge production under aerobic and anoxic condition [ C] .IAWQ 19th Biennial International Conference. 1998. 268-275.
10Wang Y Y, Peng Y Z, Li T W, et al. Phosphorus removal under anoxic conditions in a continuous-flow A2N two sludge process [J]. War Sci Technol, 2004, 50(6) : 37-44.