摘要
以贺坪峡大桥工程为实例,对悬臂施工过程中的结构仿真分析、应力监测和线形监测控制关键技术进行了系统介绍。
Taking the Heping Canyon bridge as a sample, this paper systemically introduced the key techniques such as the structme simulation analysis, stress and linear monitoring in cast -in -cantilever construction.
关键词
贺坪峡大桥
悬浇施工
控制
关键技术
Heping Canyon bridge
cast - in - cantilever construction method
control
key techniques