期刊文献+

水力停留时间对ABR系统处理红糖废水效果的影响 被引量:1

Influences of Hydraulic Retention Time on Treating of Brown Sugar Wastewater in an Anoxic Baffled Reactor
下载PDF
导出
摘要 本实验研究所构建的反应器分为5个格室,有效容积43.2 L,实验共进行43天。通过分阶段减少HRT的方式,研究其产氢及COD处理能力。ABR系统以红糖废水为原料,在温度为35℃,进水COD约5000 mg·L^(-1),HRT为8 h时产氢量最大,平均总产氢量可达到13.15 L·d^(-1);HRT为12 h时,COD去除率最大,平均总去除率可达到49.17%。产氢量最大时的HRT(8 h)与COD去除率最大时的HRT(12 h)不同。 In this study, the institute reactor chamber is divided into five cells, the effective volume is 43.2 L. The experiment was carried out 43 days. Study the hydrogen production and COD treatment capacity by way of a phased reduction of HRT. At a temperature of 35 ℃,using brown sugar wastewater as raw material,influent COD about 5000 mg·L-1. The maximum gas production could be got when the HRT is 8 h, the average total gas production could reach 13.15 L·d-1. The maximum COD removal rate could be got when the HRT is 12 h, the average COD removal rate could reach 49.17 %. HRT(8 h) of max hydrogen production and HRT(12 h) of max COD removal is not same.
出处 《广东化工》 CAS 2016年第9期22-24,共3页 Guangdong Chemical Industry
基金 黑龙江省自然科学基金(2013354)
关键词 制氢 活性污泥 厌氧 ABR hydrogen production activated sludge anaerobic ABR
  • 相关文献

参考文献15

二级参考文献105

共引文献123

同被引文献14

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部