摘要 通过某灌区项目跨河涵管设计方案由现浇混凝土管变为沉管的讨论、变更过程,详细阐述了跨河反虹涵管采用沉管法的优劣;同时,通过详细阐述沉管主要施工过程,介绍了沉管施工的一般施工工艺和主要质量控制方法,对类似项目的实施有一定参考价值。 Cross river inverted siphon culvert pipe is an important part in the construction of irrigation improvement,small watershed management and other livelihood projects. Immersed tube method is widely applied to river crossing culvert construction because of short construction period,less construction risk and investment. Through an irrigation project of cross- river culvert design scheme,the replacement of cast- in- place concrete tube with immersed tube has been discussed. The pros and cons of the immersed tube method have been explained in details. At the same time,through the elaboration of the immersed tube construction process,the general process and main quality control method of the sinking construction have been introduced,which can used as a certain reference value for similar project implementation.
作者 王衍行
出处 《广东水利水电》 2015年第11期46-49,65,共5页 Guangdong Water Resources and Hydropower
关键词 跨河反虹涵管 重建 施工方案 cross river inverted siphon culvert reconstruction construction scheme
  • 相关文献

参考文献1

  • 1中华人民共和国住房和城乡建设部.GB50268--2008给水排水管道工程施工及验收规范[M].北京:中国建筑工业出版社,2009:161-168.

同被引文献9

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部