基于BIM的工程量清单及资源计划编制研究 被引量:11

Preparation Research on Engineering Quantity List and Resource Planning Based on BIM
原文传递
导出
摘要 随着高层和超高层建筑的普及,规模庞大、体量异型、结构复杂等建筑特点使传统的管理方式不能满足设计和施工阶段的管理需求。结合工程实例,引进BIM技术创建建筑三维可视化模型,分析传统管理方法与基于BIM的管理方法在工程量统计及资源计划方面的差异,并提出偏差解决措施。 Along with the rapidly growing popularity of high-rise and super high-rise buildings,the architectural features of large scale,specifi c volume and complex structure make the traditional management way no longer meet the management needs in the design and construction phase. Combined with engineering example,introduces BIM technology to create the 3D architectural visualization model,and analyzes the differences of the traditional management method and management method based on BIM in the works of statistics and resource planning,then puts forward the solutions.
作者 赵雪媛 董娜
出处 《工程经济》 2016年第4期18-22,共5页 ENGINEERING ECONOMY
关键词 BIM 施工管理 工程量统计 资源计划 Building information modeling construction management engineering quantity statistics resource planning
  • 相关文献

参考文献8

二级参考文献25

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2中华人民共和国建设部.建设科技“十一五”规划[S].2006.
  • 3Eastman C,,Teicholz P,Sacks R,et al.BIM handbook:a guideto building information modeling for owners,managers,designers,engineers and contractors. . 2008
  • 4Wang H. J.4D Dynamic Management for Construction Planning and Resource Utilization. Automation in Construction . 2004
  • 5www.solibri.com .
  • 6www.ChinaBIM.com .
  • 7www.onuma.com .
  • 8www.tekla.com .
  • 9www.archibus.com .
  • 10www.autodesk.com .

共引文献744

同被引文献68

引证文献11

二级引证文献81

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部