摘要
介绍了间接作业法带电拆除跌落式熔断器引流线线夹的现有作业方法及工具,指出了传统法作业存在的问题,进而引入了全新的作业工具——熔断器引流线线夹拆卸器。介绍新工具的特色以及使用后产生的明显效果,旨在提高间接作业法带电拆除引流线线夹作业项目的作业质量和作业效率。
The paper introduces current approaches and tools for live removal of jumper conductor clamp of dropout fuse by use of indirect operation method; in addition, it indicates disadvantages of conventional operation methods and presents a novel operation tool for live jumper conductor clamp removal. The paper also introduces features of the new tool and the significant effect after its use. The application of the new tool can promote operation quality and efficiency of live jumper conductor clamp removal through indirect operation method.
出处
《浙江电力》
2016年第4期22-24,共3页
Zhejiang Electric Power