摘要
阐述长兴地区经济发展概况,分析长兴地区铁路货运存在发展空间受限、货场设施基础薄弱、货场作业受限、安全隐患突出等问题,提出将长兴南站货场迁出,择址新建铁路物流中心。考虑货物线调车作业方向,研究引线反接(方案Ⅰ)和引线顺接(方案Ⅱ)2个建设方案;结合土地综合开发利用率、铁路运营管理和取送作业效率、铁路物流远期发展、投资估算等条件分析,推荐长兴地区物流中心建设采用引线反接方案(方案Ⅰ)。
This paper expounds the economic development situation in Changxing area, and analyzes the problems existing in railway freight transportation in Changxing area, including limited development space, weak device foundation in freight yard, limited operation in freight yard and obvious potential safe hazard, and puts forward that it should move out freight yard in Changxing South Station and select new location for railway logistics center construction. Through considering 2 construction programs, the reversed connection of leading track(Program I) and the forward connection of leading track(Program II); combining with analysis on the conditions like integrated land exploitation and utilization rate, railway operational management and efficiency of placing-in and taking-out operation, long-term development of railway logistics as well as investment and estimation, the program of logistics center construction in Changxing area is recommended to apply the reversed connection of leading track(Program I).
出处
《铁道货运》
2016年第5期6-11,共6页
Railway Freight Transport
关键词
铁路物流中心
长兴地区
建设方案
Railway Logistics Center
Changxing Area
Construction Program