期刊文献+

盾构穿越桥桩区施工技术研究 被引量:6

Study on Construction Technology of Shield Tunnels Crossing Through Bridge Pile Foundations
下载PDF
导出
摘要 城市轨道交通工程建设中,往往因线路与既有建(构)筑物的基础结构冲突或过近而绕行或改线,给工程建设带来一定的影响。以郑州市某地铁线路中穿越既有桥梁桩基区域为背景,介绍了灌注桩拔除施工工艺,对新建桩基在盾构近距离穿越期间的性状变化进行了分析,并提出了盾构在类似地层情况下近接施工的建议。 In construction of urban rail transit,the conflict between the line and the foundation of existing structure often lead to realignment or bypass,and it will bring an impact on the construction. Taking a section of shield tunnel crossing through bridge piled foundation in Zhengzhou as background,this paper introduces the methods to pull out deep pile,analysis the characteristic change of new piles during crossing time. The research results puts forward some suggestions on the similar adjacent construction projects.
作者 路建民 张艳
出处 《施工技术》 CAS 北大核心 2016年第10期108-112,共5页 Construction Technology
关键词 盾构 桩基 拔除 变形 监测 数值模拟分析 shield tunnel piles pulling deformation monitoring simulation
  • 相关文献

参考文献3

二级参考文献18

共引文献37

同被引文献43

引证文献6

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部