大宁煤矿综采工作面巷道布置优化设计 被引量:5

Optimization design of roadway layout in Daning coal mine fully mechanized working face
下载PDF
导出
摘要 针对大宁煤矿3~#煤层赋存条件及工作面原有巷道布置特点,分析了回采巷道顶板大面积下沉原因,结合错层位巷道布置的特点,提出调整巷道布置位置解决巷道维护困难的思路,并对工作面巷道布置方案进行了优化,最后对确定的优化方案进行了工作面设计,经计算验证该方案具有较好的社会效益和经济价值,为错层位采煤法的进一步推广提供了依据。 Aiming at the occurrence conditions of 3~#coal seam and the working face roadway layout features in Daning coal mine,the reason for large area roadway roof subsidence is analyzed,and a thought of roadway layout position adjustment is proposed to resolve the roadway maintenance difficulties,combining with the characteristics of stagger arrangement roadway layout. And the roadway layout optimization scheme is proposed. Finally the working face is designed for the optimization scheme,and the social and economic benefits are verified by calculation.
出处 《煤炭工程》 北大核心 2016年第5期4-7,共4页 Coal Engineering
关键词 巷道布置 顶板下沉 错层位 区段煤柱 roadway layout roof subsidence stagger arrangement section coal pillar
  • 相关文献

参考文献8

二级参考文献30

共引文献189

同被引文献46

引证文献5

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部