摘要 针对广深港客运专线福田站基坑"中心岛"开挖支护方案,从试验原理、模型设计、工况模拟及试验观测等方面提出应用土工离心模型试验研究深大基坑支护结构的安全性及基坑稳定性的试验模拟技术,测试混凝土连续墙的弯矩及土体的位移变形,结果表明:1)混凝土连续墙上的弯矩呈上大下小的分布趋势,远离基坑一侧受拉;2)基坑及附近土体均有不同程度的位移变形,由于试验与工程实际应力历史不同,试验测得沉降及变形均比实际工程现场测值偏大,离心模型试验结果偏于安全;3)基坑及附近各种加固措施有效抑制了土体的位移变形,提高了基坑的安全性。该试验技术对于深大基坑支护结构设计方案的论证、优选具有重要实践意义。 With the " Center Island" excavation and support scheme in Futian station foundation pit in Guangzhou-Shenzhen-Hongkong passenger line as a background, test principle, model design, condition simulation, and test observations of the geotechnical centrifugal model test were provided. Geotechnical centrifugal model tests applied to study the safety and stability of the large and deep foundation pit support structure. The concrete continuous wall moment and the displacement deformation of soil were measured. Results show: 1 ) The concrete continuous wall moments present a distribution with the upper larger and the lower smaller and the far side of the foundation is under tension. 2) There are displacement and deformation of soil in foundation pit and its nearby regional, which is due to different stress path between centrifugal model test and practical engineering. The deformation measured in the test is larger than that of the practical engineering and test results show certain safety margins. 3 ) The displacement and deformation of soil is effectively inhibited by some reinforcement measures and the safety of foundation pit is also improved. These test results are important to optimize the foundation pit support structure design.
出处 《结构工程师》 北大核心 2016年第2期152-158,共7页 Structural Engineers
基金 河南省科技发展计划项目(122102310449)
关键词 基坑工程 土工离心机 模型试验 中心岛 foundation pit project, geotechnical centrifuge, model test, center island
  • 相关文献

参考文献7

二级参考文献26

  • 1杜延龄.土工离心模型试验基本原理及其若干基本模拟技术研究[J].水利学报,1993,25(8):19-28. 被引量:34
  • 2杨龙才,王炳龙,周顺华,刘建国.基坑边坡变形和稳定性的离心试验研究[J].上海铁道大学学报,2000,21(10):100-105. 被引量:11
  • 3章为民,窦宜.土工离心模拟技术的发展[J].水利水运科学研究,1995(3):294-301. 被引量:14
  • 4余龙.软土盾构隧道纵向长期沉降离心模型试验研究[D].上海:同济大学,2010.
  • 5Taylor R N. Geotechnical Centrifuge Technology [ M ]. London : Blackie Academic& Professional, 1995.
  • 6Bowles J E.Foundation Analysis and Design(ThirdEdition)[M].New York:McGraw Hill,1982.
  • 7Jean Louis Briaud,Yujin Lin.Soil-Nailed Wall Un-der Piled Bridge Abutment[J].ASCE,Journal ofGeotechnical and Geoenvironmental Engineering,1997,123(11).
  • 8Teramoto K,Taga N,Naruse T,et al.Model loadingtests of reinforced slope with steel bars[C]∥Interna-tional Conference on Earth Reinforcement Practice,Fukuoka,1992,(1):561-566.
  • 9Frydman S,Baker R,Levy A.Modeling the soil nail-ing-excavation process[C]∥Proceedings of Interna-tional Conference Centrifuge 94,Singapore,1994:669-674.
  • 10Tei Kouji.A study of soil nailing in sand[D].Ox-ford:Oxford University,1993.

共引文献159

同被引文献9

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部