基于G-COWA的工程项目界面风险评价 被引量:17

Risk Evaluation of Engineering Project Interface Based on G-COWA
下载PDF
导出
摘要 近年来,工程项目逐渐趋于大型化,界面风险的复杂性也愈发明显。然而当前国内外对于界面风险的研究相对较少,完备的界面风险评价体系尚未形成。为实现对界面风险的科学评价,根据工程项目界面管理的特点,以系统的观点深入剖析项目的全寿命周期目标管理系统,对复杂多变的工程项目界面进行梳理,基于项目目标管理构建了包含6个主要因素、25个下属要素指标的工程项目界面风险指标体系;将COWA算子客观赋权与灰色聚类相结合,建立了G-COWA工程项目界面风险评价模型。最终通过分析,验证了该评价模型对工程项目界面风险评价的科学性和有效性。 As the engineering project gradually tends to large-scale,the complexity of the interface risk has been more obvious. However,the current domestic and foreign researches on the interface risk are relatively few,the effective interface risk evaluation system has not been formed. In order to realize the scientific evaluation of interface risk,according to the characteristics of engineering project interface management,the in-depth analysis of the whole life cycle of the target management system based on the viewpoint of system is done to sort out the complex engineering project interface. Based on the project target management,the engineering project interface risk index system which covers 6main factors and 25 subordinate factors is constructed; A G-COWA engineering project interface risk assessment model is established by combining the COWA operator with the grey clustering method.Eventually,through the analysis,it is verified that the evaluation model is scientific and effective for the risk evaluation of engineering project interface.
出处 《土木工程与管理学报》 北大核心 2016年第3期16-21,共6页 Journal of Civil Engineering and Management
基金 山东省自然科学基金(ZR2011GL021)
关键词 工程项目界面风险 项目目标管理 COWA算子赋权 灰色聚类 G-COWA engineering project interface risk project objective management COWA operator weights grey clustering G-COWA
  • 相关文献

参考文献14

  • 1GIBB A G F. The Management of Construction Inter-faces-preliminary Results from an Industry Sponsored Research Project Concentrating on High Performance Cladding in the UK [ C ]//Construction Vision 2000, SCAL Convention Proceedings. Singapore Contractors Association Ltd, 1994 : 89-93.
  • 2Stuckenbruck L C. Integration: the essential function of project management[J]. Project Management Hand- book, 1988 , 2: 56-81.
  • 3Weshah N, Ghandour W, Jergeas G, et al. Factor a- nalysis of the interface management (IM) problems for construction projects in Alberta [ J ]. Canadian Journal of Civil Engineering, 2013, 40(9) : 848-860.
  • 4Pavitt T C, Gibb A G F. Interface management within construction : in particular, building facade [ J ]. Jour- nal of Construction Engineering and Management, 2003, 129 (1): 8-15.
  • 5成虎.项目管理[M].北京:高等教育出版社,2004.
  • 6姜保平,傅道春.工程建设项目的界面管理[J].苏州科技学院学报(工程技术版),2005,18(1):47-51. 被引量:51
  • 7朱启超,陈英武,匡兴华.复杂项目界面风险管理模型研究[J].科研管理,2005,26(6):149-156. 被引量:28
  • 8李俊辉,郭海滨.基于F-AHP的建设项目组织界面管理评价[J].土木工程与管理学报,2012,29(1):102-107. 被引量:5
  • 9官建成,张华胜.界面管理水平评价的灰色聚类方法与应用[J].北京航空航天大学学报,2000,26(4):465-469. 被引量:22
  • 10Yager R R. Families of OWA operators [ J ]. Fuzzy Sets and System, 1993, 59(2) : 125-148.

二级参考文献64

共引文献378

同被引文献134

引证文献17

二级引证文献100

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部