水位变动较大河道环保疏浚与底泥处置方案 被引量:3

Environmental dredging and sediment treatment program in larger-fluctuation river
下载PDF
导出
摘要 为解决水位变动较大河道的环保疏浚与底泥处置问题,基于山美水库进库河道段疏浚工程,总结如何合理地选择疏浚时机,采用适合特定水位下的疏浚设备统筹施工,利用太阳能自然干化降低底泥含水率,从而提高生产效率、节约成本,为后续工程提供经验借鉴。 To solve the problem caused by larger-fluctuation river of environmental protection dredging,the paper takes the environmental dredging project of Shanmei reservoir as an example to summarize the way of choosing reasonable dredging time,adopting the proper dredging equipment used for the specific water level,and using the natural drying of solar energy to reduce the water content of the sediment,and thus improve the efficiency and save the cost,to provide experience for the subsequent engineering.
作者 葛高岭
出处 《水运工程》 北大核心 2016年第5期170-174,共5页 Port & Waterway Engineering
关键词 环保疏浚 较大水位变动 自然干化 生产效率 environmental dredging larger fluctuation natural drying production efficiency
  • 相关文献

参考文献9

二级参考文献51

共引文献93

同被引文献26

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部