基于模糊综合评判法的淮安市古黄河水利枢纽工程可行性研究 被引量:5

Fuzzy comprehensive evaluation method-based feasibility study on Ancient Yellow River Water Control Project in Huai'an
下载PDF
导出
摘要 本文研究了古黄河水利枢纽工程的可行性。根据工程实际,运用层次分析法建立指标体系,采用模糊综合评判法对其进行综合评估,分析工程建设必要性与相关规划符合性,对防洪、除涝、供水、第三人合法水事权益、调度方案及管理体制的影响等。根据最大隶属度原则,综合评价结果为良,工程总体可行。 The feasibility of Ancient Yellow River Water Conrol Project is studied herein. In accordance with the practicality of the project,a index system is established with AHP( Analytic Hierarchy Process),and then it is comprehensively evaluated with the fuzzy comprehensive evaluation method,i. e. the impacts from the necessity of the construction of the project and the compliance of the relevant planning,and the influence of flood and water-logging control,water supply,leagal water right of the third part,operation scheme,management system,etc. According to the principle of maximum degree of membership,the result from the comprehensive evaluation is better,thus the project is generally feasible.
出处 《水利水电技术》 CSCD 北大核心 2016年第4期14-17,23,共5页 Water Resources and Hydropower Engineering
关键词 模糊综合评判法 指标体系 可行性研究 水利枢纽工程 fuzzy comprehensive evaluation method index system feasibility study water control project
  • 相关文献

参考文献8

二级参考文献44

共引文献36

同被引文献48

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部