期刊文献+

时间约束工作流的可调度性分析 被引量:3

Schedulability analysis of timing constraint workflows
下载PDF
导出
摘要 提出一种时间约束工作流的可调度性分析方法。针对时间约束Petri网(Timing Constraint Petri Nets,TCPN)为普通Petri网无法建模多参与资源的不足,给出了扩展的时间约束Petri网(w-TCPN)的定义;结合w-TCPN的拓扑结构,从模型和实例两个层次,给出了w-TCPN变迁可调度的判定定理;提出了时间约束的调整策略。w-TCPN的研究使得时间约束工作流的建模和可调度性分析更加合理。 A schedulability analysis approach of timing constraint workflows is proposed. According to the deficiency of Timing Constraint Petri Nets(TCPN for short)which is ordinary Petri net that can’t be used to model multiple resources, extended Timing Constraint Petri Nets(w-TCPN for short) is defined. Then, based on the topological structure of w-TCPN, from the two levels of model and case, the verification method for the schedulability of w-TCPN is presented in the form of theorems. In the end, the adjustment strategy of timing constraint is proposed. The research of w-TCPN makes the modeling and schedulability analysis of timing constraint workflows more reasonable.
作者 冯复剑
出处 《计算机工程与应用》 CSCD 北大核心 2016年第12期26-30,共5页 Computer Engineering and Applications
关键词 工作流 时间约束 可调度性分析 workflow timing constraint schedulability analysis
  • 相关文献

参考文献16

二级参考文献33

  • 1唐达,刘丹妮.一种工作流时间截止期限的动态验证方法[J].计算机集成制造系统,2004,10(9):1154-1159. 被引量:8
  • 2陶泽,谢里阳,袁锋.受时间约束的工作流关键路径的确定[J].计算机工程与应用,2004,40(29):21-23. 被引量:7
  • 3潘炎,汤庸.模糊时态工作流网的建模和时间可能性分析[J].计算机集成制造系统,2006,12(11):1779-1784. 被引量:8
  • 4宋巍,窦万春,刘茜萍.时间约束Petri网及其可调度性分析与验证[J].软件学报,2007,18(1):11-21. 被引量:21
  • 5LING S, SCHMIDT H. Time Petri nets for workflow modeling and analysis[C]//Proceedings of IEEE International Conference on Systems, Man and Cybernetics. Washington, D. C. , USA:IEEE,2000:3039-3044.
  • 6LI J Q, FAN Y S, ZHOU M C. Timing constraint workflow nets for workflow analysis [J]. IEEE Transactions on Systems, Man, and Cybernetics, 2003,33(2) :179-193.
  • 7TSAI JJP, YANG S J, CHANG Y H. Timing constraint Petri nets and their applications to schedulability analysis of real- time system specifications[J]. IEEE Transactions on Software Engineering, 1995,21 ( 1 ) : 32-49.
  • 8Li Weiping, Fan Yushun. A time management method in workflow management system [C]//Proceedings of 2009 Workshops at the Grid and Pervasive Computing Conference. Geneva, Switzerland: Springer Verlag, 2009:3 - 10.
  • 9Son J H, Kim M H. Finding the critical path in a time- constrained workflow[C]. // Proceedings of the Seventh International Conference on Real-Time Systems and Applications. Cheju Island, South Korea: IEEE Comput Soc, 2000:102 - 107.
  • 10Son J H, Kim J H, Kim M H. Deadline allocation in a time-constrained workflow[J]. International Journal of Cooperative Information Systems, 2001, 10 ( 4 ): 509 -530.

共引文献32

同被引文献23

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部