变电所一次设备安装调试施工探析 被引量:3

Analysis of the installation and commissioning of the equipment in Substation
下载PDF
导出
摘要 现今,随着人们生产生活的快速发展,对于供电提出了更高的要求,变电所作为电力系统中重要的组成部分,其一次设备的安装质量对于整个电力系统的安全稳定运行有着重要的发展意义,本文主要是针对变电所一次设备安装与调试施工的实际工作开展问题进行的分析和论述,重点对变电所一次设备安装调试施工实际过程中需要强调的问题进行研究,最终提出相关的调试措施,保证变电所一次设备安装调试施工的进一步发展。 Today,with the rapid development of production and life of the people,for the supply of proposed higher requirements,substation as an important part of power system,the installation quality of the equipment for the safe and stable operation of the whole power system has important significance to the development.The main purpose of this paper is for a substation equipment installation and debugging, construction of practical work to carry out the analysis and discussion, focusing on substation is a equipment installation and commissioning problems should be emphasized in the actual construction process were studied, finally puts forward relevant debugging measures,to ensure the construction of a substation equipment installation and commissioning of further development.
作者 花芳
出处 《电子测试》 2016年第5期112-112,102,共2页 Electronic Test
关键词 变电所 一次设备 安装调试 施工 substation equipment installation and debugging construction
  • 相关文献

参考文献8

二级参考文献11

共引文献45

同被引文献10

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部