摘要
随着近年来工程建设的飞速发展,软土地基处理的规模越来越大,现场监测多采用人工测量,人工成本的逐年增加给监测单位造成了巨大的压力。基于此,采用导管、沉降环、陆上土体分层沉降量自动电测仪、手持监测仪器组成陆上土体分层沉降自动电测系统。系统性能良好,可节约人工成本,保障现场人员人身安全,克服恶劣天气影响,保证工程质量。
With the rapid development of engineering construction in recent years, the scale of soft soil improvement becomeslarger and larger. However, field monitoring was mostly carried out manually, which imposes tremendous pressure on to themonitoring contractor due to the yearly increase of labor cost. Based on this, an automatic measuring system to measuresettlement of layered soils on land was built composing of conduits, layered soil subsidence ring, automatic electric instrumentto measure settlement of layered soils, and hand-hold monitoring instrument. The system has a good performance, cuts downlabor costs, ensure the safety of field personnel, is able to overcome bad weather, and ensure the quality of the works.
出处
《中国港湾建设》
2016年第6期72-75,共4页
China Harbour Engineering
关键词
软土地基
陆上土体分层沉降
研发
soft soil
settlement of layered soil
research and development