地铁车站盾构井处临时环梁计算优化分析 被引量:2

Optimization Analysis of Calculation of Temporary Ring Beam for Shield Hoisting Shaft of Metro Station
下载PDF
导出
摘要 盾构井在盾构吊装期间,侧向压力主要由临时环梁承担,开孔周边受力情况较为复杂。本文通过对地铁车站盾构井处临时环梁进行三维建模计算,并与传统二维计算结果进行对比,得出如下结论:1)二维计算存在局部弯矩过大及配筋过于保守等缺点,有一定的优化余地;2)相对于二维计算,三维整体建模计算结果更加合理,得出的结构尺寸及配筋结果对于类似工程具有一定的参考意义。 During the shield hoisting,the lateral pressure is mainly borne by the temporary ring beam; meanwhile,the stresses of surrounding soil are complicated. A three-dimensional model of temporary ring beam is built and calculated.The calculation results are compared with conventional two-dimensional model. Some conclusions are drawn as follows:1) Two-dimensional calculation has some disadvantages,such as too large bending moment and over-conservative reinforcement,etc. 2) Compared with two-dimensional calculation,three-dimensional modeling calculation results are more rational. The study results can provide references for similar projects in the future.
作者 高涛 赵芮
出处 《隧道建设》 北大核心 2016年第5期544-548,共5页 Tunnel Construction
关键词 地铁车站 盾构井 临时环梁 SAP2000 有限元 三维整体计算 二维计算 Metro station shield hoisting shaft temporary ring beam SAP2000 finite elements three-dimensional integral calculation two-dimensional calculation
  • 相关文献

参考文献10

二级参考文献52

共引文献216

同被引文献20

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部