摘要
为提高煤炭开采的效率,对影响煤矿巷道掘进的因素进行了简单梳理,从地质构造、掘进设备、施工工艺、人为因素等四方面提出了相应解决办法,以提高煤矿产量,保证巷道工作人员安全,在优化巷道掘进工作效率的同时,使煤矿企业获得更大的经济效益。
The influence factors of coal mine roadway tunneling were systemized in order to improve the efficiency of the coal mining in this paper, the corresponding solutions were proposed from aspects such as geological structure, excavating equipment, construction technology, human factors and so on to improve the coal mine production, ensure the safety of staff in the roadway, optimize working efficiency of roadway tunneling, and gain greater economic benefits for coal mine enterprises.
出处
《能源与节能》
2016年第6期138-139,共2页
Energy and Energy Conservation
关键词
煤矿巷道
掘进
地质构造
爆破
coal mine roadway
tunneling
geological structure
blasting