摘要
主要分析中国岩巷快速掘进施工技术,根据当前存在的问题进行研究并提出相应的改进措施,以期促进中国煤矿事业稳定发展,从而为相关行业提供充足的能源。
This paper mainly analyzed the quick rock gangway tunneling construction technique in China, and put forward the corresponding improvement measures according to the problems existing in the current study in order to promote the stable devel- opment of China's coal mine enterprise and provide adequate energy for related industries.
出处
《能源与节能》
2016年第6期147-148,共2页
Energy and Energy Conservation
关键词
岩巷快速掘进
施工技术
改进措施
quick rock gangway tunneling
construction technology
improvement measures