盾构带压开仓作业控制要点 被引量:5

Control points of Shield job opening with pressure
下载PDF
导出
摘要 在地铁盾构法隧道施工过程中,因地质条件复杂,特别是碰到上软下硬地层,对刀具磨损特厉害,经常需要开仓进行换刀作业,采用带压开仓作业对施工工艺要求较高,在地质条件差的情况下,建压和保压容易失败,仍存在很大的风险性。本文根据工程实例,通过采取开仓前准备、开仓过程控制、刀具更换、监控量测等各种安全技术措施顺利完成换刀作业,希望对相同或相近的盾构开仓作业起到借鉴作用。 In the subway shield tunnel construction process,due to the complexity of the geological conditions especially touched the soft and hard strata,tool wear is very severe,so it is often need to open for changing knife. The requirement of construction process of chamber opening operation with pressure is high. Under poor geological conditions,pressure establishment and pressure maintaining is prone to failure,so there is still great risk. According to the engineering example,various safety technical measures such as the preparation before the opening,open process control,tool change,monitoring and measuring were used to complete operation of changing knife to the shield. It is hoped to provide reference for the same or similar open warehouse operations.
作者 曾跃平
出处 《福建建设科技》 2016年第3期66-69,共4页 Fujian Construction Science & Technology
关键词 地铁项目 盾构区间 带压开仓 检查和换刀 技术管控 Metro Shield tunnel opening with pressure check and change the knife control technology
  • 相关文献

参考文献5

  • 1梁青槐.地铁工程施工安全管理与技术[M].北京:中国建筑工业出版社,2012.
  • 2中华人民共和国住房和城乡建设部.GB50446-2008盾构法隧道施工与验收规范[S].北京:中国建筑工业出版社,2008.
  • 3竺维彬,袁敏正.浅论广州地铁对中国盾构技术进步的贡献[c]//2004年中德隧道(盾构)技术研讨会论文集.2004,7.
  • 4竺维彬,鞠世健.复合地层中的盾构施工技术.中国科学技术出版社,2006,5.
  • 5HUAN LUIS MAGRO,硬岩掘进技术的最新发展[c]//2004年中德隧道(盾构)技术研讨会论文集.2004,7.

共引文献12

同被引文献12

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部