摘要
结合工程实例,首先简单介绍了工艺性试桩的步骤,然后对湿喷桩现场施工控制要素进行重点分析,最后强调了施工质量保证的措施,以期能够为同行带来一些启发。
Combined with the engineering example,the paper briefly introduces process of trial piles,then analyzes construction elements of wet cement mixed piles. At last the paper emphasizes assurance measures of construction quality,in order to bring some inspirations to peers.
出处
《黑龙江交通科技》
2016年第2期14-15,共2页
Communications Science and Technology Heilongjiang
关键词
湿法水泥
搅拌桩
软土地基
施工质量
wet cement
cement mixed piles
soft clay ground
construction quality