摘要 基于护巷煤柱稳定性分析和煤体内弹塑性分区,采用弹塑性理论和数值模拟等相关手段,研究了泰安矿极近距离煤层开采条件下,11号煤层区段煤柱留设的合理宽度。研究发现:为了保证煤柱稳定及巷道变形可控,同时最大程度减小煤炭损失,11#煤煤柱宽度不应小于10 m. Based on the stability analysis of protection roadway coal pillar and elastic- plastic partitions in coal,using elastic- plastic theory and numerical simulation method,studies on the reasonable unexploited coal pillars of No. 11 coal seam under the condition of extremely close distance coal seam mining in Taian coal mine. The research fiding that in order to guarantee the stability of coal pillar and control roadway deformation,minimizes the coal loss at the same time,No. 11 coal pillar width should not be less than 10 m.
作者 马玉川
出处 《山西焦煤科技》 2016年第3期34-39,共6页 Shanxi Coking Coal Science & Technology
关键词 极近距离煤层 区段煤柱 弹塑性分区 数值模拟 Extremely close distance coal seam Section coal pillar Elastic-plastic partition Numerical simulation
  • 相关文献

参考文献6

二级参考文献12

共引文献183

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部