摘要
本文通过对我国火电工程项目的现状进行分析[1],发现目前大多数火电工程项目都只注重工程建设,很少对火电工程项目建设效果进行评价。这不利于行业积累经验和设计水平的提高。本文正是基于这一需求,将火电工程项目建设效果评价模型[2]运用到实践之中。
This article through to the present status of thermal power projects in China were analyzed,and found that most thermal power engineering project are currently only pay attention to engineering construction,rarely evaluate the effect of thermal power construction project.All of this is bad for industry experience and design level.In this paper,based on the demand,the effect of thermal power construction project evaluation model into practice.
出处
《东北电力大学学报》
2016年第3期102-105,共4页
Journal of Northeast Electric Power University
关键词
火电工程
建设效果模型
模糊综合评判
Thermal power project
Construction Effect model
Fuzzy comprehensive evaluation