期刊文献+

基于全寿命周期的城市电力管沟规划建设模式研究 被引量:5

Research on Planning and Construction Mode for City Power Pipeline Based on Life Cycle Cost
下载PDF
导出
摘要 以城市电力管沟规划建设为研究对象,探索电力企业作为出资主体的电力管沟规划建设模式,分析其优缺点。改进传统项目决策方式,以最大化资产经济效益为目标,项目技术性能满足电网要求为约束条件,提出基于全寿命周期的城市电力管沟规划建设决策方法和全寿命工程实用化计算方法,寻求项目资产全寿命周期的最佳方案,以提高电力管沟工程项目规划决策水平。 The planning and constructing mode, as electric power enterprises are investors, for city power pipeline and their advantage and disadvantage are studied. The traditional decision method is improved, in which the optimization is set as maximize economic benefit. The improved method can satisfy the constraint. In order to improve the decision level, a life cycle based decision and computational method for pipeline planning to search the best solution is proposed.
出处 《江苏电机工程》 2016年第3期34-38,共5页 Jiangsu Electrical Engineering
关键词 城市电力管沟 规划建设模式 全寿命周期 决策方法 city power pipeline planning and construction mode life cycle cost decision method
  • 相关文献

参考文献4

二级参考文献19

  • 1李丽敏,顾天鸿,陈进杰.关于降低我国地铁造价的探讨[J].国防交通工程与技术,2005,3(4):6-8. 被引量:4
  • 2周喜军,黄华炜,戈京,王昕.抽水蓄能电站运行方式的LCC研究[J].华东电力,2006,34(7):67-70. 被引量:10
  • 3北京交通大学,北京城建设计研究总院有限公司.降低地铁造价及工程建设管理等若干问题的研究[R].北京:北京交通大学,2003.
  • 4KISHK M, Al-HAJJ A. Fuzzy modelling of life cycle costs of alternatives with different lives [C]// Glasgow Caledonian University. The 16th Annual Conference of the Association of Researchers in Construction Management (ARCOM). Glasgow: IEEE, 2000: 92-101.
  • 5ERTO P, LANZOTTI A. Statistical model life cycle costreliability for a new mass transit vehicle[C]//Wessex Institute of Technology. Proceedings of the 4th International Conference on Computer Aided Design, Manufacture and Operation in the Railway and Other Mass Transit Systems. Southampton: Computational Mechanics Publ, 1994 : 102-109.
  • 6KISHK M, Al-HAJJ A. A fuzzy model and algorithm to handle subjectivity in life cycle costing based decision-making[J]. Journal of Financial Management of Property and Construction, 2000, 5(1/2): 93-104.
  • 7JUN H K, KIM J H. Life cycle cost modeling for railway vehicle[C]//Korea Railroad Research Institute. Proceeding of International Conference on Electrical Machines and Systems. Seoul: IEEE, 2007: 1989-1994.
  • 8ASIEDU Y. Product life cycle cost analysis: state of the art review[J]. International Journal of Production Research, 1998, 36(4) : 883-908.
  • 9GREENE L E, SHAW B L. The steps for successful life cycle cost analysis [C]// Proceedings of the IEEE 1990 National Aerospace and Electronics Conference, May 21-25, 1990,Dayton, OH, USA: 1209-1216.
  • 10SOLOMON R, SANDBORN P A, PECHT M G. Electronic part life cycle concepts and obsolescence forecasting[J]. IEEE Trans on Components and Packaging Technologies, 2000, 23(4) : 707-717.

共引文献117

同被引文献64

引证文献5

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部