摘要
以国信协联电厂在建的2×400 MW级燃机热电联产工程为依托,详细介绍了该工程中LZC139-13.2/1.4/555/550型汽轮机碰撞试验前需具备的条件、试验的正确方法及注意事项,明确了碰撞试验的正确步骤,并对高中压合缸在试验过程中出现的问题进行了分析和总结,为同类型机组正确进行碰撞试验提供了参考。
This paper described the requirements, the correct method and matters need attention of the LZC139-13.2/1.4/555/550 steam turbine casing collision test, which was relied on the project of one 2 × 400 MW grade gas turbine cogeneration of Guoxin Xielian power plant. Then the problems raised from the test were analyzed and summarized. The aim of this project was to provide guidance for carrying out the collision test correctly in the same type of units.
出处
《江苏电机工程》
2016年第3期91-93,共3页
Jiangsu Electrical Engineering
关键词
汽轮机
转子
缸体
碰撞试验
turbine
rotator
cylinder block
collision test