摘要
本文介绍了新疆吉音水利枢纽工程混凝土防渗墙施工过程与质量控制采取的方法,对保证成墙质量、加快施工进度发挥了重要作用。防渗墙综合质量检测表明,工程质量合格。
In the paper, the methods adopted for concrete cut-off wall construction process and quality control in Xinjiang Jiyin Water-control Project are introduced. They play important role in guaranteeing finished wall quality and accelerating construction progress. Cut-off wall comprehensive quality test shows that the project is qualified.
出处
《中国水能及电气化》
2016年第5期18-21,共4页
China Water Power & Electrification
关键词
吉音工程
混凝土防渗墙
质量控制
Jiyin Project
concrete cut-off wall
quality control