摘要
以广中江高速公路北街水道桥工程为例,设计了一套适应索塔异形截面的爬架体系,介绍了该爬架系统的结构组成要素,并阐述了爬架施工工艺流程,解决了异形截面索塔变化多、施工难的问题。
Taking the north channel bridge engineering in Guangzhongjiang Expressway as an example, this paper designed a climbing frame systemadapt to cable bent tower special-shaped section, introduced the structure elements of climbing frame system, and elaborated the climbingframe construction process, solved the problems of profiled cable bent tower more changes, difficult construction.
出处
《山西建筑》
2016年第14期154-156,共3页
Shanxi Architecture
关键词
斜拉桥
爬架
索塔
异形截面
cable-stayed bridge, climbing frame, cable bent tower, special-shaped section