介绍了常州火车站南广场行包房的结构设计过程;对行包房下社会通道方案、基础方案选型、基础施工方案、上部结构特点、转换梁选型等方面进行了详细地阐述。可供同类工程设计时参考。
The structural design process of the Luggage and Parcel House in Chang Zhou Railway Station South Square is introduced in this paper;also, it gives a particular expatiation on the project selection about the underground passage under the Luggage and Parcel House, the project selection about the foundation,the construction scheme of the foundation, the characters of the upper structure, the transfer beam selection, etc.It may be used as a reference for similar projects.
出处
《江苏建筑》
2016年第2期55-59,共5页
Jiangsu Construction
关键词
地下通道
支护桩利用
相邻基础
预应力混凝土转换梁
underground passage
use of retaining piles
adjacent foundations
prestressed concrete transfer beam