在临江建筑施工中,基坑降水是关系整个基坑开挖的关键环节之一,也是影响工期和整个工程施工质量的重要因素。对哈尔滨市一临松花江超高层建筑超深基坑地下水处理的设计及实施过程进行了介绍,对施工过程的设计参数选取、施工经验及不足进行了探讨和总结。
Foundation pit dewatering is one of the key links in the excavation for building construction by the riverside and is an important factor affecting the construction period and the construction quality of the whole project. The paper introduces the design and implementation process of groundwater treatment for the ultra-deep foundation pit of a high-rise building by Songhuajiang. The selection of the design parameters in the construction process,the construction experience and deficiency are discussed and summarized,which can be reference to the subsequent construction.
出处
《探矿工程(岩土钻掘工程)》
2016年第6期81-83,共3页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
临江基坑
超深基坑
基坑降水
大口径管井
止水帷幕
foundation pit by riverside
ultra-deep foundation pit
foundation pit dewatering
large diameter tube well