苗尾水电站右岸倾倒变形边坡加固设计 被引量:6

Reinforcement for deformed and toppled slope at right bank of Miaowei Hydropower Station
下载PDF
导出
摘要 苗尾水电站在施工中出现多次坝基边坡倾倒变形。在调研坝址区工程地质水文气象资料的基础上,分析了坝址区岩体结构及岩体倾倒变形的基本特征、倾倒岩体的稳定性及失稳机制,并据此得出大坝右岸坝基边坡倾倒变形的变化规律。在此基础上结合现场实际,采取了一系列必要的工程措施进行加固处理,相关经验可供类似工程借鉴。 During the construction of Miaowei Hydropower Station,the toppling and deformation of dam foundation appeared several times. On the basis of investigating the geological,hydrological and meteorological data of the dam site,the basic characteristics of rock mass structure and rock toppling and deformation,the stability and instability mechanism of toppling rock were analyzed. So the toppling and deformation law of left bank dam foundation was obtained. In combination with the field practice,a series of necessary engineering measures were adopted to reinforce the dam foundation. The relevant experiences can be used for reference of similar engineering in future.
出处 《人民长江》 北大核心 2016年第11期82-85,共4页 Yangtze River
关键词 倾倒变形 稳定性分析 加固处理 苗尾水电站 toppling deformation stability analysis reinforcement Miaowei Hydropower Station
  • 相关文献

参考文献2

二级参考文献6

共引文献5

同被引文献74

引证文献6

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部