中国新能源发展历程(英文)

Renewable Energy Development in China
下载PDF
导出
摘要 The National Wind Power Integration Research and Test Center was put into operation with the approval of NEA on January 6.Q/GDW 432-2010,Specifications for wind power dispatching management,was released by SGCC in February.China’s first offshore wind farm with total installed capacity of 102 MW,Shanghai Donghai Bridge Wind farm,was completed in June.1.5 MW doubly-fed wind turbine The National Wind Power Integration Research and Test Center was put into operation with the approval of NEA on January 6.Q/GDW 432-2010,Specifications for wind power dispatching management,was released by SGCC in February.China’s first offshore wind farm with total installed capacity of 102 MW,Shanghai Donghai Bridge Wind farm,was completed in June.1.
出处 《China Standardization》 2016年第2期46-49,共4页 中国标准化(英文版)