摘要
介绍了DN1 000给水管道穿越汾河管廊的施工方法,从前期准备、施工阶段、竣工阶段等方面,阐述了具体的施工步骤,并归纳了施工的技术要点,为今后给水管道采用入廊施工方式积累了经验。
The paper introduces the construction methods of DN1 000 water-supply pipeline crossing Fenhe pipe gallery, from the preparation phase, construction phase and complete phase, illustrates its construction steps, and sums up the technical points in the construction, so as to ac-cumulate experience for the construction methods in the water-supply pipeline in future.
出处
《山西建筑》
2016年第18期116-117,共2页
Shanxi Architecture
关键词
给水管道
综合管廊
钢管
焊接
water-supply pipeline, comprehensive pipe gallery, steel p ipe, welding