摘要
介绍了FOUNDATION FIELDBUS现场总线的特点和调试步骤,结合660 MW超超临界燃煤机组的投产调试,从现场总线物理连接层和软件组态配置层2个方面进行了全面的分析,逐一提出了调试运行中应注意的问题,为现场总线的推广应用提供借鉴。
The paper introduces advantages and commissioning steps of FOUNDATION FIELDBUS and com-prehensively analyzes physical connection layer and software configuration layer of fieldbus in accordance with the commissioning of 660 MW ultra-supercritical coal-fired units;besides, it presents precautions in commis-sioning one after another to provide a reference for fieldbus popularization and application.
出处
《浙江电力》
2016年第6期53-56,60,共5页
Zhejiang Electric Power