基于Montrac+PLC的自动化生产线的调度优化

Scheduling Optimization of Automatic Production Line Based on Montrac + PLC
下载PDF
导出
摘要 针对串行和并行并存的多工序自动化生产线出现的UPH值偏低问题,生产线的调度优化显得格外重要。首先阐述一液晶屏装配生产线的硬件架构设计;然后针对Montrac的Shuttle调度原理和Switch调度原理进行详细讨论,Montrac与PLC进行UDP通信,通过PLC在Montrac中写入穿梭车的目标地址,并实现在自动化运输系统中的应用,使得一辆穿梭车上的各批工件在LEF作业区的进出站时间和加工时间,即该站小车循环时间保持在20 s左右;最终,在该调度原理基础上达到理想的UPH值。 According to the low value of UPH appeared in serial and concurrent multistation production line system,the scheduling optimization of production line seems very important. In the paper,the hardware structure of LCD assembly production line is designed. The Shuttle scheduling principle and Switch scheduling principle of Montrac are presented. The target address of a shuttle is written into Montrac by PLC through UDP communication. The application of the Montrac scheduling principle in the automatic transportation system makes that the in-and-out time and the processing time of each piece at the LEF work is maintained in 20 sec. At last,on the basis of the scheduling principle,the ideal UPH value is achieved.
出处 《仪表技术》 2016年第6期24-26,30,共4页 Instrumentation Technology
关键词 自动化生产线 调度优化 PLC UPH Montrac 目标地址 循环时间 automatic production line scheduling optimization PLC UPH Montrac target address cycle time
  • 相关文献

参考文献3

二级参考文献21

  • 1孙建华,高广章,蒋志强,施进发.程序分析法在产线平衡中的应用[J].机械设计与制造,2005(5):148-150. 被引量:18
  • 2Carlier,J, Rebaie,I. Two branch and bound algorithms for the permutation flow shop problem[J]. European Journal of Opera tional Research,1996,90(2):238- 251
  • 3Woo, H S, Yim, D S. A heuristic algorithm for mean flowtime objective in flowshop scheduling[J]. Computer and Operations Research, 1998, 25:175- 182
  • 4Osman,I H,Potts,C N. Simulated annealing for permutation flow- shop scheduling[J]. OMEGA International Journal of Man agement Science, 1989,17(6): 551- 557
  • 5Neppalli,V R , Chen,C L , Gupta,J N D. Genetic algorithms for the two- stage bicriteria flowshop problem[J]. European Journal of Operational Research, 1996,95: 356- 373
  • 6Garey E L , Johnson D S, Sethi R. The complexity of flowshop and jobshop scheduling. Maths Ops Res,1976,1:117- 129
  • 7Lee I, Shaw, M J. A neural- net approach to real time flow- shop sequencing. Computers & Industrial Engineerng,2000,38: 125- 147
  • 8范中志,张树武,孙义敏.基础工业工程[M].北京:机械工业出版社,2001.
  • 9Dantzig G B, Ramser J H. The truck dispatching problem [ J ]. Management Science,1959(6) :80-91.
  • 10Ghoseiri K, Ghannadpour S F. Multi-objective vehicle routing problem with time windows using goal programming and genetic algorithm[J]. Applied Soft Computing,2010,10(4) :1096-1107.

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部