期刊文献+

护坡桩不到底应急补救方案在基坑工程中的应用

Application of Emergency Remedy Scheme for Not in Place Retaining Pile in Foundation Pit Engineering
下载PDF
导出
摘要 潍坊某基坑支护工程施工基本完成,基坑开挖到一定深度后,发现局部护坡桩未施工至设计桩底标高,给基坑工程造成极大安全隐患。经分析,采用锚杆挡墙应急补救加固方案,有效排除了该质量事故所造成的安全隐患,快速控制了险情的发生,使得工程安全顺利进行。 A foundation pit supporting project construction has basically completed in Weifang city,after the excavation at a certain depth we found that the local retaining pile did not be constructed to the designed elevation,which caused great potential safety hazard and the risk of dangerous case of the foundation pit engineering. Through the analysis,we used the anchor rod retaining wall based emergency remedy and reinforcement scheme,the potential safety hazard caused by quality accident was eliminated effectively,the occurrence of risk was controlled quickly,the project could be continued safely.
出处 《工程质量》 2016年第6期53-55,共3页 Construction Quality
关键词 护坡桩 不到底 锚杆挡墙 应急加固 retaining pile not in place anchor rod retaining wall emergency reinforcement
  • 相关文献

参考文献5

  • 1朱永电第八十九医院经济适用房纂坑支护工程设计[R].潍坊:山东省潍坊基础工程公司,2013.
  • 2河北大地土木工程有限公司.DBl3[J]31--2001长螺旋钻孔泵压混凝土桩复合地基技术规程[s].河北:河北石家庄市科学出版社,2001.
  • 3张伟.第八十九医院经济适用房岩土工程勘察报告[R].济南:山东正元建设工程有限责任公司,2012.
  • 4吕勤.CFG桩在地基加固工程中的应用[J].铁道建筑技术,2005(1):48-49. 被引量:3
  • 5北京理正软件设计研究院有限公司.F--SPW6.5北京理正深基坑支护计算软件[cP].北京:北京理正软件设计研究院有限公司,2010.

二级参考文献2

  • 1JGJ94—94.建筑桩基技术规范.[S].中华人民共和国建设部,..
  • 2J220—2002.建筑地基处理技术规范.[S].,..