中部引黄工程输水隧洞施工中涌水注浆处理方案设计

Grouting Scheme Design of Water Gushing in Tunnel Construction of the Central Yellow River Diversion Project
下载PDF
导出
摘要 通过对山西省中部引黄工程勘探试验洞Ⅰ标在隧洞施工过程中出现的涌水的分析,制定了"堵水,稳定地层"的处理方案,并对处理涌水过程中的有关要求和相应工艺等方面的内容进行明确,实现了解决该处涌水问题的目的,为在后续施工中遇到类似的涌水情况提供处理经验。 Water shut-off and stratum stabled treatment schemes were established with analysis of water gushing appeared in the Central Yellow River Diversion Project in Shanxi Province,and the requirements and corresponding technology were also definite. It accomplished the purpose of solving water gushing problem and provided experiences for similar situations in the subsequent constructions.
作者 刘宏利
出处 《山西水利科技》 2016年第2期39-41,共3页 Shanxi Hydrotechnics
关键词 中部引黄工程 隧洞涌水 注浆封堵 the Central Yellow River Diversion Project tunnel water gushing grouting
  • 相关文献

参考文献4

二级参考文献5

  • 1曾蔚,张民庆.圆梁山隧道2^#溶洞平导施工技术研究[J].岩石力学与工程学报,2006,25(1):191-198. 被引量:10
  • 2水利部陕西水利电力勘测设计研究院.陕西省引红济石调水工程初步设计报告.2006.
  • 3陕西省引红济石调水工程初步设计工程地质勘查报告(内部资料).2006.
  • 4杨晓东主编.锚固与注浆技术手册[M],北京:中国电力出版社.2009.
  • 5张民庆.高压动水砂层溶洞地质注浆加固施工技术[J].隧道地下工程,2002.

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部