2008年10月份华庆项目部开始在甘肃省华池县元城镇进行定向井作业,到目前已完钻注水井,采油井一百余口,完井周期也已经由原先的二十天提高到现在的十天,相继解决了延安、延长组卡钻问题,洛河段井漏问题,完井电测直罗遇阻问题,现在影响提速的最大问题是井眼轨迹控制问题。
October 2008 Huaqing Department Began the Project in Gansu Province Huachi yuan towns Directional Drilling operations to the Currently Drilled injection wells, Production wells a Hundred Mouth, Completion Period has Twenty days from the original up to ten days now, we have been resolved Yah' an, Yanchang sticking problem, Luo fiver lost Circulation Problems, Completion of electrical measuring Zhiluo Difficult question, the biggest problem now affects speed is well trajectory control problem.
出处
《化工设计通讯》
CAS
2016年第3期18-18,28,共2页
Chemical Engineering Design Communications
关键词
元城隆起
定向井
钻具组合
轨迹控制
自然增斜
yuan city uplift
directional well
assembly : trajectory control