摘要
介绍10000m^3减压渣油拱顶储罐底板、罐壁、拱顶在项目现场的预制,和储罐的组装、焊接工序流程,以及充水试验的详细施工流程。
The paper mainly introduced preparation of 10000m^3 vacuum residue dome tank bottom plate,shell plate and roof plate.Meanwhile,the paper discussed process flow of tank assemble,welding and hydrostatic test.
出处
《山东化工》
CAS
2016年第12期92-93,95,共3页
Shandong Chemical Industry
关键词
减压渣油储罐
组装
充水试验
vacuum residue dome tank
assemble
hydrostatic test