人工湖设计需水量分析与计算 被引量:1

Analysis and calculation of artificial lake design water demand
下载PDF
导出
摘要 根据昌图县工业园区发展规划,拟建一座人工湖,设计并计算人工湖需水量,结合实地调查,选取北洼子与王家油房两座水库为水源。因地区缺乏实测径流资料,采用参数等值线法计算北洼子水库与王家油房水库多年平均及75%保证率下的来水量,根据水库调节方法与原则,进行两座水库供水调节计算,根据水库实际供水量,以定供需,确定人工湖用水量,从而为人工湖设计提供有力的保证。 According to Changtu county industrial park development,an artificial lake will be built,whose capacity is needed to design and calculate.In the paper,combined with field surveys,two reservoirs were selected to supply water,which is respectively Beiwazi reservoir and Wangjiayoufang reservoir.Due to lack of area measured runoff data,the parameter contour method was applied to calculate the inflow between annual average rate and 75% guaranteed rate.According to the methods and principles of regulating reservoir,the two reservoirs supply adjustment calculation is concluded.Referred to the actual water supply of reservoirs,make sure the capacity of artificial lake determined by water supply and demand,which can provide a stong guarantee for the design of the artificial lake.
作者 宋亮
出处 《黑龙江水利》 2016年第6期38-41,共4页
关键词 参数等值线法 需水量 保证率 水库调节计算 人工湖 parameter contour method water demand guaranteed rate reservoir regulation computing artificial lake
  • 相关文献

参考文献3

  • 1昌图水利勘测设计院.昌图县老四平镇北洼子水库除险加固工程初步设计报告[R].昌图:昌图水利勘测设计院,2008.
  • 2辽宁江河水利水电新技术设计研究院.昌图县王家油房水库重点调查复核报告[R].沈阳:辽宁江河水利水电新技术设计研究院,2013.
  • 3周毅.水库联合调度中长系列与典型年调节计算方法探讨与应用[J].中国水能及电气化,2011(7):35-39. 被引量:6

二级参考文献4

  • 1海南省昌化江大广坝水利水电二期(灌区)工程初步设计报告:第Ⅳ卷陀兴系统[R].长沙:中国水电顾问集团中南水利电力勘测设计研究院.2006.
  • 2SL104-95水利工程水利计算规范[S].北京:中华人民共和国水利部,1995.
  • 3海南省昌化江大广坝水利水电二期(灌区)工程初步设计报告:第Ⅶ卷陀兴系统[R].长沙:中国水电顾问集团中南水利电力勘测设计研究院.2006.
  • 4海南省大广坝水利水电二期(灌区)工程陀兴系统水源工程方案优化专题报告[R].兰州:甘肃省水利水电勘测设计研究院,2009.

共引文献5

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部