摘要
结合金山区蒙山路高中压门站下游中压燃气管网升压作业实例,对埋地燃气中压管道升压作业制定可行性方案,尤其对重要环节制定风险控制措施和应急处置措施。
In this paper a feasible scheme of increasing pressure for buried medium-pressure pipeline was made. In combination with the practice of booster operation of gas pipe network on Meng Shan Road in Jinshan district, the author discusses some risk control and emergency measures for important phases in details.
出处
《上海煤气》
2016年第3期7-9,共3页
Shanghai Gas
关键词
升压
作业方案
控制措施
increasing pressure, operation scheme, control measure